Ohio’s propane consumption is substantial and seasonal conditions (freeze/thaw cycles) require storage solutions specified for durability and regulatory compliance. Use these verified considerations to plan a successful project.
1. Prioritize ASME Certification & Documentation
Always require ASME Section VIII construction, a legible nameplate, and the National Board U1A data report so state permitting and audits proceed without delays.
2. Materials, Coatings & Cathodic Protection
Specify corrosion-resistant coatings and cathodic protection (for buried tanks) appropriate for Ohio soils and humidity to extend service life and reduce maintenance.
3. Site Selection & Logistics
Locate bulk storage near distribution hubs to minimize bobtail miles and improve refill cadence—this reduces transport costs and improves service levels.
For Ohio projects, request Ingusa Group’s site-review and a proposal that includes ASME documentation, coating options and logistics planning to ensure a code-compliant, long-life installation.